A new article quotes a Tata spokesman saying "Initially steel rolls will be one metre wide with 10% efficiency leading to a production of 400 MW per year".
...I think that's 4 million sqm per year - equating to $200 million for Dyesol.
The article starts out saying large scale industrialisation is 5 years away, but this figure isn't attributed to the Tata guy. Dyesol's chart suggests efficiency's increasing at the rate of 1% per year, which will lead to 10% by end-2013. The article also says Dyesol's "ahead of the game".
http://www.link2portal.com/could-solar-power-breakthrough-kill-nuclear-power
- Forums
- ASX - By Stock
- GSL
- 10% efficiency for first mass produced steel
10% efficiency for first mass produced steel
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)