These are the assumptions behind the Macquarie estimate.
For a theoretical 100 mbbl FPO oil project, this returns an NPV per bbl of
US$3.40. Assumptions are as follows:
~ Oil price US$19/bbl real, Brent.
~ 100 mbbl oil project.
~ Peak flow rate 55,000 bopd.
~ 9 year production life.
~ Total OPEX and CAPEX US$710m.
~ Contractor share of oil for cost recovery: 60%.
~ Contractor share of profit oil up to 70%
~ Production bonus US$14m.
~ Corporate tax rate 25%
~ Real discount rate 10% after tax.
They assume long term oil price of $19 which seems overly conservative.
- Forums
- ASX - By Stock
- 113.5 metres oil column
HDR
hardman resources limited
These are the assumptions behind the Macquarie estimate.For a...
-
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries