December quarter work program at Golden Swan - (1) Mining studies (2) DSO discussions. Silver Swan - (3) Drilling (4) Mine Studies (5) Reserve estimates. Black Swan Open Pit (6) Mine studies. Silver Swan Tailings- (7) Mine studies (8) Met Studies. Total Production Platform - (9) Ore blending studies (10) Preliminary Economic Assessment Black Swan Open Pit (11) Pit dewatering. Lake Johnston (12) set up for drilling program over a number of targets. What happens when we get some major new hits going into early 2022. (13) evaluation of shipping other 100% owned nickel ores to Black Swan plant.
POS is 13 months from restart of nickel production at Black Swan. Ongoing activity is at "full throttle" Re-start of Lake Johnston plant may also get fuller attention. IMHO current stock price is extremely undervalued.
- Forums
- ASX - By Stock
- 13 months to nickel production
December quarter work program at Golden Swan - (1) Mining...
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POS (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.14M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $6.732K | 1.944M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
86 | 52138598 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 7847467 | 24 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
86 | 52138598 | 0.003 |
34 | 55836387 | 0.002 |
16 | 69512753 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 7847467 | 24 |
0.005 | 9426813 | 19 |
0.006 | 9137028 | 16 |
0.007 | 27148936 | 13 |
0.008 | 5500000 | 2 |
Last trade - 12.54pm 16/08/2024 (20 minute delay) ? |
Featured News
POS (ASX) Chart |