Clean Coal policies:
Coal based power as of now accounts for about 60.8% (167.2GW) of India’s installed capacity.
In order to secure reliable, adequate and affordable supply of electricity, coal will continue to dominate power generation in future.
Government of India has already taken several initiatives to improve the efficiency of coal based power plants and to reduce its carbon footprint.
All new, large coal-based generating stations have been mandated to use the highly efficient supercritical technology.
Renovation and Modernisation (R&M) and Life Extension (LE) of existing old power stations is being undertaken in a phased manner.
About 144 old thermal stations have been assigned mandatory targets for improving energy efficiency.
Coal beneficiation has been made mandatory. Introduction of ultra-supercritical technology, as and when commercially available is part of future policy.
Besides, stringent emission standards being contemplated for thermal plants would significantly reduce emissions.
http://www4.unfccc.int/submissions/INDC/Published Documents/India/1/INDIA INDC TO UNFCCC.pdf
page 10
Obviously worthy of it's own thread
Tick Tock
- Forums
- ASX - By Stock
- ECT
- 144 Old Indian Power Station with Mandatory Targets
144 Old Indian Power Station with Mandatory Targets
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ECT (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $9.515M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $5.745K | 1.915M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
38 | 24264363 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 3301911 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
38 | 24264363 | 0.002 |
18 | 27219024 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 3301911 | 5 |
0.004 | 11153031 | 14 |
0.005 | 5729789 | 31 |
0.006 | 5261067 | 11 |
0.007 | 2628334 | 7 |
Last trade - 15.59pm 30/07/2024 (20 minute delay) ? |
Featured News
ECT (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online