KEY 0.00% 0.1¢ key petroleum limited

The lastest report from Aminex(27thsept) -"Delays in delivery of...

  1. 74 Posts.
    The lastest report from Aminex(27thsept) -

    "Delays in delivery of the Caroil-6 due to mechanical problems have set back our drilling project at Nyuni by over three months but we currently anticipate the rig will be ready for hand over to us in mid-October. All other materials and services are in place for spudding Kiliwani-1 as soon as the rig has been mobilised to our site, on the small island of Kiliwani about one kilometre south of Songo-Songo island. The second well is due to be drilled at a location known as Kiliwani North but we are keeping our options open as we have yet to test the capabilities of the Caroil-6 rig in its upgraded state. "

    Looks good.

    Hope this helps

    Cheers :-)
 
watchlist Created with Sketch. Add KEY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.