Today's announcement indicates over 90% recovery through cracking and leaching stage. This coupled with previous announcement of over 70% recovery through the concentration process at Mount Weld equates to over 15% higher recovery than the design case:
Concentrator design 63% recovery, cracking and leach design 87% recovery = 54.8% recovery for both plant processes.
Actual concentrator >70% recovery, actual cracking and leaching >90%, which is at least 63% recovery for both plant processes.
63%/54.8% = 115% of original design case.
This can be either translated into 15% lower costs for these sections or 15% higher production of REO for these sections.... either way is a major win.
- Forums
- ASX - By Stock
- 15% high product recovery than design
Today's announcement indicates over 90% recovery through...
-
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LYC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.71 |
Change
-0.090(1.15%) |
Mkt cap ! $7.206B |
Open | High | Low | Value | Volume |
$7.78 | $7.80 | $7.59 | $17.72M | 2.310M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 16763 | $7.70 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$7.73 | 13637 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 16763 | 7.700 |
2 | 2845 | 7.660 |
1 | 13341 | 7.630 |
2 | 32483 | 7.620 |
2 | 24838 | 7.610 |
Price($) | Vol. | No. |
---|---|---|
7.730 | 13637 | 5 |
7.740 | 13341 | 1 |
7.750 | 13341 | 1 |
7.760 | 13341 | 1 |
7.770 | 13341 | 1 |
Last trade - 16.10pm 03/10/2024 (20 minute delay) ? |
Featured News
LYC (ASX) Chart |