"Austin Exploration (“Austin” or “the Company”) (ASX:AKK)
today announced that exploratory well, C18 #3, has
been successfully drilled to vertical depth through the Pierre
formation, and logs are currently under evaluation."
7 weeks of log evaluation seems a tad long to me, perhaps I am being impatient with this ' flagship ' acreage.
Does anyone have a time frame they believe to be fair with evaluation of logs?
- Forums
- ASX - By Stock
- AKK
- 18 #3 Drilled to successful depth 5th May
18 #3 Drilled to successful depth 5th May
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AKK (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online