EXT 0.00% 0.9¢ excite technology services ltd

19 drill rigs, 28 km drilling pm

  1. 798 Posts.
    lightbulb Created with Sketch. 126
    Sometime in the next four weeks another two drilling rigs will be on site at Rossing South, bringing the total up to 19 drill rigs. The month of March saw a record 28,000m being drilled.

    As part of the DFS there is a pilot plant proof of design starting in Perth, which will be used to determine best use of reagents such as sulphuric acid and water consumption.

    If EXT was not looking at being taken over, why are so many drill rigs being used in virgin ground to expand the resource size? If they were looking only to build a mine the drilling would concentrate on infill drilling only. Running a record number of drill rigs is expensive, the only reason is to expand the resource size.

    You can listen to a four minute interview on boardroom radio at http://www.brr.com.au/event/65185
 
watchlist Created with Sketch. Add EXT (ASX) to my watchlist
(20min delay)
Last
0.9¢
Change
0.000(0.00%)
Mkt cap ! $13.27M
Open High Low Value Volume
0.9¢ 1.0¢ 0.9¢ $51.82K 5.741M

Buyers (Bids)

No. Vol. Price($)
2 750000 0.9¢
 

Sellers (Offers)

Price($) Vol. No.
1.0¢ 16369146 15
View Market Depth
Last trade - 15.53pm 29/07/2024 (20 minute delay) ?
EXT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.