LYC 1.62% $7.89 lynas rare earths limited

1st feed to kiln , page-28

  1. 115 Posts.
    lightbulb Created with Sketch. 22
    I am in the metallurgical plant building business. To dry out a blast furnace or Corex plant it takes approx. 3 weeks. After such time you would then start feeding a plant.
    Heating from 0 to 100 °C can go very fast, but afterwards you typically have a temperature gradient of 4-5 °C/h and after 200 °C of 2-3 °C/h. Everything depends of course on the type of refractory used.

    As in a rotary kiln the temperatures required are lower (as mentioned above 650 °C and not e.g. at Corex 1000 °C) I would guess heating of the plant will take approx. 11 to 14 days.

    br

    good luck to all
 
watchlist Created with Sketch. Add LYC (ASX) to my watchlist
(20min delay)
Last
$7.89
Change
-0.130(1.62%)
Mkt cap ! $7.374B
Open High Low Value Volume
$7.97 $8.02 $7.86 $27.21M 3.442M

Buyers (Bids)

No. Vol. Price($)
3 12329 $7.86
 

Sellers (Offers)

Price($) Vol. No.
$7.90 8744 2
View Market Depth
Last trade - 16.10pm 01/10/2024 (20 minute delay) ?
LYC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.