LYC 2.37% $7.78 lynas rare earths limited

1st feed to kiln , page-51

  1. 262 Posts.
    lightbulb Created with Sketch. 12
    New refractory lining in the cement industry for example is dried for 48h and then without any feed heatet up within 72h to 1500°C; after that feeding of raw meal is started.
    To heat kilns of a size of the LAMP and then cool it down again, doesn't make any sense for two reasons:
    1) it's just an unnecessary waste of energy
    2) any change in temperature is disadventageously for stability under load within runtime of refractory lining

    Therefore an engineer could start firing a kiln if the TOL is internally announced by mail or phone in advance of written affirmation, if not just leave it as it is.
 
watchlist Created with Sketch. Add LYC (ASX) to my watchlist
(20min delay)
Last
$7.78
Change
0.180(2.37%)
Mkt cap ! $7.272B
Open High Low Value Volume
$7.45 $7.92 $7.41 $46.84M 6.050M

Buyers (Bids)

No. Vol. Price($)
1 1000 $7.75
 

Sellers (Offers)

Price($) Vol. No.
$7.81 77676 2
View Market Depth
Last trade - 16.10pm 01/11/2024 (20 minute delay) ?
LYC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.