POS 25.0% 0.3¢ poseidon nickel limited

$2 Club, page-544

  1. 9,879 Posts.
    lightbulb Created with Sketch. 4272
    TBC
    There is an easy way to get to this target at a $6B MC here.
    I have outlined it in this thread many times.

    step 1 - offtake with Trafigura/Jinchuan/BHP and cash deposit $45M with debt loan $45M
    step 2 - refurb mill BS circuit 2 & dewater the BS open pit
    step 3 - start production at SS GS gosling BS dissem to BS mill circuit 2 of 1.1MTpa 8ktpa
    step 4 - refurb circuits 1 & 3 at BS & start production of FTWholeM to 2.2mtpa using BS open pit ore
    production soars to 16ktpa-25ktpa
    step 5 - refurb LJ mill and dewater EA MH mines
    step 6 - start production at LJ based on 2015 DFS (AISC of 5.31 now at 31% lower AUD$) 8ktpa -15ktpa
    step 7 - dewater W and transport W ore to BS mill, another 10ktpa

    production rockets 8ktpa-15kpt-22ktpa-53ktpa
    NP rockets from 10-11-15-25
    revenues triple, margins triple, divy issued, share buybacks instituted
    MC follows the money and POS becomes the bankers darling

    Why have they stalled before step 1 so many many times?!
    Why is the offtake being "finalised in months" since Nov 2020?!

    TBC hey presto, simple, is it not?!
 
watchlist Created with Sketch. Add POS (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
-0.001(25.0%)
Mkt cap ! $11.14M
Open High Low Value Volume
0.4¢ 0.4¢ 0.3¢ $30.51K 8.505M

Buyers (Bids)

No. Vol. Price($)
85 51047716 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 11169632 16
View Market Depth
Last trade - 16.10pm 19/08/2024 (20 minute delay) ?
POS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.