My understanding is that there was only two rc holes drilled
The drill programme will continue for up to three (3) weeks, with availability for additional holes if required. Segue will be analysing samples on-site with a portable XRF, followed by chemical assaying and litho-geochemical fingerprinting. Figure 3 shows the location of the first two targets to be drill tested (E1 and E15) with Figures 4 & 5 showing details on each target area.
- Forums
- ASX - By Stock
- AMD
- 2 Days Till Results
2 Days Till Results, page-2
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AMD (ASX) to my watchlist
|
|||||
Last
0.4¢ |
Change
-0.001(12.5%) |
Mkt cap ! $36.88M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.3¢ | $9.481K | 2.426M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
43 | 57224155 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.4¢ | 85291953 | 37 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
40 | 56519982 | 0.003 |
125 | 257679549 | 0.002 |
57 | 218704925 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 82991961 | 34 |
0.005 | 42177968 | 29 |
0.006 | 41559036 | 26 |
0.007 | 13607924 | 16 |
0.008 | 9207849 | 10 |
Last trade - 15.18pm 19/07/2024 (20 minute delay) ? |
Featured News
AMD (ASX) Chart |