To put things into perspective, a good-sized Surat Basin mine in Qld like Kogan Creek mines 3-4 million tons per year.
A small Bowen Basin mine like Cockatoo's Baralaba is 500 to 700 ktpa.
For Abadi to be producing 2mpta, this close to a market and this close to the surface, will be a damn good effort. And yes, 50+ cps.
This is not just some two-bit operation, it's full-scale.