Valmec looking for Another Senior estimator job in structural , mechanical and piping fabrication, construction.
Logic says they wouldn’t be looking if there wasn’t some future tender business in the pipeline.
Have watched SRG global push strongly above their pre covid levels on the back of a good infrastructure presentation.
Valmec still lagging a fair way below their pre covid price so hopefully they have another announcement shortly will push them back above the 30c plus levels .
The recent presentation was top shelf but they certainly didn’t get the follow up buying on the back of it like other companies have. Very much still flying under the radar.
- Forums
- ASX - By Stock
- VMX
- 20 million in new contracts
20 million in new contracts, page-73
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)