The decision to mine will still go ahead as planned. However, the current resource is still relatively small even with the HG zone. The latest drilling should allow the JORC to be re-classed to Measured and Indicated, and should also increase the resource.
But the company also needs to look beyond the immediate future, and plan for future operations to enable a good programme of work going forward.
Now look at the amount of previous drilling, and the amount that AVB have now said that they will do with the CR. There is no doubt that AVB are trying to prove up a much larger resource than the current one.
- Forums
- ASX - By Stock
- AVB
- $20 million placement closed over subscribed
$20 million placement closed over subscribed, page-5
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)