AUZ 0.00% 0.8¢ australian mines limited

20 tonne sample, page-10

  1. 264 Posts.
    lightbulb Created with Sketch. 178
    I knew you were just joking. I heard it was because the supplier in China used the material that did not meet the standard as required (caused by different standards between China and Australia). So it was delayed. I wished HPAL was hijacked because the criminal is easy to find and his name is Deep Steve.
 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.