SRI 6.25% 1.7¢ sipa resources limited

SRI-Just arrived...

  1. 322 Posts.
    SIPA RESOURCES INTERNATIONAL NL 2002-10-10 ASX-SIGNAL-G

    HOMEX - Perth

    +++++++++++++++++++++++++
    We are pleased to announce results of recent first-pass Reverse
    Circulation drilling east of the Zeus Gold Deposit located about two
    kilometres east of the Mount Olympus gold treatment plant at our
    Paraburdoo Gold Project.

    The drilling was aimed to test for the extension of the Zeus Pit 4
    orebody down plunge to the east and to gain sulphide mineralisation
    for the first "exploratory" metallurgical testwork programme to be
    conducted on sulphides at Paraburdoo in five years. This
    "exploratory" work will focus on establishing an economic solution
    to treating refractory sulphide ores at the Paraburdoo Gold Project.

    The Zeus Pit 4 orebody provided 175,000 tonnes of ore grading 2.8 g/t
    from a pit about 50 metres deep and 180 metres long. The ore was
    bracketed between two south dipping faults and was typically 15
    metres to 25 metres thick and plunged gently (about 20deg) to the
    east. The faults are less than 50 metres apart through Pit 4 but have
    separated to about 80 metres apart on the most easterly section
    drilled. The southern fault is the Zoe Fault that controls, and
    probably feeds, the mineralisation at Zeus and at the Mount Olympus
    deposit to the west. Mount Olympus had Identified Mineral Resources
    of some 800,000 ounces of gold, 600,000 ounces ofwhich are in
    refractory sulphide mineralisation (estimated at a 0.75 g/t gold
    Cutoff). The Paraburdoo Gold Project has produced about 200,000
    ounces of gold from Mount Olympus oxide and transition ores since
    1999. Stockpiled medium and low grade (1.6 g/t and 1.2 g/t,
    respectively) ore from Mount Olympus is currently being blended with
    high grade oxide ore from the recently commissioned Waugh deposit
    (400,000 tonnes at 7.8 g/t gold).

    Eight holes have recently been drilled onthree 40 metre spaced
    sections east of the Zeus Pit 4. Holes on each section intersected
    increasing widths of mineralisation away from the pit, ranging from
    7 metres @ 4.4 g/t to 51 metres @ 2.6 g/t (including 22 metres @ 4.0
    g/t), indicating an increase in size of the deposit down plunge. It
    appears that the gentle plunge of the ore in Pit 4 flattens through
    the 120 metres just drilled. The considerable thickness of
    mineralisation intersected in ZEC125 (51 metres) is interpreted as
    being close to true thickness and hence indicates significant tonnage
    potential along strike to the east, particularly as the bounding
    faults are diverging, or "opening-up" easterly.

    Drilling details are presented in the accompanying table. It should
    be noted that this drilling was designed to scope the mineralisation
    potential down-plunge of Pit 4, following a re-evaluation of the
    structural geology of the Paraburdoo Gold Project. Further drilling
    is planned to better define the shape and metallurgical character of
    the mineralisation down-plunge of Pit 4.

    Samples have been taken for metallurgical testwork and will form part
    of the first "exploratory" metallurgical testwork programme for five
    years on refractory sulphides from Paraburdoo. Drill hole samples had
    been exhausted and mineralisation at the base of the open pits is of
    transitional, rather than truly sulphide type.

    The testwork will also include sulphide mineralisation collected
    from drilling just completed beneath the floor of the Mount Olympus
    pit. The drilling was designed in part to provide metallurgical
    samples and in part to confirm the down dip and down plunge
    projection of a high grade portion of the Mount Olympus oxide orebody
    that was mined from the 50 metre interval above the pit floor. That
    interval contained a shoot of some 630,000 tonnes grading 6.5 g/t.
    Results of this drilling are not yet available.

    TABLE OF ZEUS RC DRILL RESULTS - 10 OCTOBER 2002

    SECTION HOLE NO FROM (M) TO (M) INTERVAL (M) AU (G/T)

    593660E* ZEC119 50 57 7 4.36
    ZEC121 50 56 6 1.58
    593700E ZEC122 60 70 10 2.51
    81 90 9 5.00
    ZEC123 49 51 2 1.75
    61 63 2 1.27
    ZEC124 63 90 27 2.05
    including
    63 67 4 5.08 and
    75 76 1 2.25 and
    93740E 81 90 9 3.34
    ZEC125 54 105 51 2.61
    including
    54 57 3 1.53 and
    59 67 8 2.95 and
    69 91 22 4.02 and
    95 105 10 1.57

    * holes ZEC120 and 126 were mainly drilled outside of
    the fault-bounded mineralised block and did not include significant
    gold mineralisation


    M Doepel (M AusIMM)
    MANAGING DIRECTOR
 
watchlist Created with Sketch. Add SRI (ASX) to my watchlist
(20min delay)
Last
1.7¢
Change
0.001(6.25%)
Mkt cap ! $3.879M
Open High Low Value Volume
1.7¢ 1.7¢ 1.7¢ $2.455K 144.4K

Buyers (Bids)

No. Vol. Price($)
6 606441 1.6¢
 

Sellers (Offers)

Price($) Vol. No.
1.7¢ 132147 3
View Market Depth
Last trade - 11.08am 20/05/2024 (20 minute delay) ?
Last
1.7¢
  Change
0.001 ( 6.25 %)
Open High Low Volume
1.7¢ 1.7¢ 1.7¢ 30600
Last updated 11.00am 20/05/2024 ?
SRI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.