HIGHLIGHTS
• Results received for Area 1 Prospect, Erongo Granites Project continue to extend identified
zone of near surface uranium mineralization.
• Results received for a further sixteen holes, with all drill holes intersecting anomalous
uranium mineralization. Better results include:
o 30m at 223 ppm U3O8 (including 13m at 386 ppm U3O8), from 11m to 41m.
o 37m at 200 ppm U3O8 (including 12m at 287 ppm U3O8), from 20m to 57m.
o 10m at 207 ppm U3O8, from 54m to 64m.
o 8m at 206 ppm U3O8, 15m to 23m.
o 12m at 174 ppm U3O8 (including 5m at 254ppm U3O8), from 79m to 91m.
• Drilling has now confirmed uranium mineralization over an area of 1,000 metres by 500
metres, from surface to depths exceeding 100m.
• The zone of known uranium mineralization remains open in all directions. The drilling
programme will now target extensions a further 500m to the north east, east and south east of
area drilled to date, with the objective of substantially increasing the zone of uranium
mineralization.
• Second RC drill rig now scheduled to be on site in mid September and will drill test an initial
4kms of potential strike length at Area 3 Prospect.
Add to My Watchlist
What is My Watchlist?