--> IF <-- it turns out to be similar pt, pd, Ni mineralization distributions as per current lake, we could be looking at assays just under 1gt pgE.
Eg: TBND002 was 0.5 to 1% Sulphides and assayed: 0.33g/t Pt+Pd+Au to 0.51g/t Pt+Pd+Au
So with 1-3% we could be looking at long intersects of approx 1% Pt+Pg+Au at Beaver Lake.
- Forums
- ASX - By Stock
- MMB
- 200m intersection at bulls eye target
200m intersection at bulls eye target, page-6
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)