We are now at 201 meters down, however seems our drilling rig injector pump is damaged. 2-3 days down time, not to bad seem like all things considered they are progressing well. Also mentions they hope to hit potential at 200m, i wonder if the 1 meter stuffed the pump cause of the coal and or gas?? could this have had any affect?
ev
Add to My Watchlist
What is My Watchlist?