We are now at 201 meters down, however seems our drilling rig injector pump is damaged. 2-3 days down time, not to bad seem like all things considered they are progressing well. Also mentions they hope to hit potential at 200m, i wonder if the 1 meter stuffed the pump cause of the coal and or gas?? could this have had any affect?
ev
We are now at 201 meters down, however seems our drilling rig...
Add to My Watchlist
What is My Watchlist?