some people think ORD will go up this year to 20cent just because of Alumina project Wrong we have more than one project and the one i'm interested in is the gold project.
look at the (ASX:TAM)close to Suplejack Gold Project and see the gold grade
0.6 metres @ 1,409g/t Au from 63.6m
9 2.1 metres @ 174g/t Au from 70.3m
9 0.3 metres @ 179g/t Au from 36.7m
9 1.7 metres @ 14.7g/t Au from 80.7m
19 metres @ 10.9g/t from 176 metres
3.5 metres @ 32.2g/t from 156.9m
so if we have one good drill from suplek gold project than good by 10cent and welcome high 20's 30's
![]()
![]()
- Forums
- ASX - By Stock
- VAN
- 2011
2011, page-21
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)