Pow4ade and AJ,
I am with you on this one. Twice we have been given guidance on this. We were told in June that drilling would start in the middle of July (to me that was 15/16 July) Then we were told drilling would commence on or about 22 July (to me that would have been 21/22/23 July).
In my opinion, it may have been better to say "a drilling timetable is being prepared and share holders will be advised when drilling commences"
I for one have always been a stickler for timetable adherence in business.
Anyway that will all be forgotten when the drilling starts and those "to be fast tracked targets" are drilled...hhhmmmm ... I wonder when that will be?
I have a feeling that this drill season will make or break SGQ.
Cheers
Mulac1
- Forums
- ASX - By Stock
- SGQ
- 2019 Nickel outlook
2019 Nickel outlook, page-142
-
- There are more pages in this discussion • 440 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SGQ (ASX) to my watchlist
|
|||||
Last
2.6¢ |
Change
0.002(6.25%) |
Mkt cap ! $25.20M |
Open | High | Low | Value | Volume |
2.4¢ | 2.6¢ | 2.4¢ | $50.84K | 1.996M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 751317 | 2.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 6000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 751317 | 0.024 |
6 | 3708719 | 0.023 |
4 | 4032040 | 0.022 |
2 | 260000 | 0.021 |
3 | 201000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 6000 | 1 |
0.027 | 433400 | 3 |
0.028 | 709799 | 5 |
0.029 | 365701 | 2 |
0.030 | 402784 | 2 |
Last trade - 15.44pm 28/06/2024 (20 minute delay) ? |
Featured News
SGQ (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online