Exactly right. Detailed engineering design of the 8ktpa commercial plant (along with pre-construction studies, permitting etc.), will commence during phase 2. These engineering optimisation studies can take a long time. There is no way that an FID will be made prior to the demo plant having run at full capacity for a length of time such that there is sufficient confidence in the build and process.
- Forums
- ASX - By Stock
- 2021 - General Discussion
Exactly right. Detailed engineering design of the 8ktpa...
Featured News
Add CCM (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.5¢ |
Change
0.004(7.84%) |
Mkt cap ! $20.40M |
Open | High | Low | Value | Volume |
5.3¢ | 5.5¢ | 5.1¢ | $13.21K | 251K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 200000 | 4.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.4¢ | 18518 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 200000 | 0.049 |
1 | 12000 | 0.046 |
1 | 12000 | 0.043 |
1 | 500000 | 0.042 |
1 | 25000 | 0.040 |
Price($) | Vol. | No. |
---|---|---|
0.054 | 18518 | 1 |
0.056 | 4500 | 1 |
0.058 | 1650 | 1 |
0.059 | 4000 | 1 |
0.060 | 76000 | 3 |
Last trade - 14.13pm 01/11/2024 (20 minute delay) ? |
Featured News
CCM (ASX) Chart |