CCM 1.61% 6.3¢ cadoux limited

2021 - General Discussion, page-5895

  1. 373 Posts.
    lightbulb Created with Sketch. 83
    When it comes to acronyms I think these are important in the next stage of development for FYI/Alcoa with the 1000tpa plant built first and the 8500tpa plant probably being started while the first plant is still being finalised. This summary is a google search Project schedules, note the 6 month minimum led-time for RFQ & Bid Doc's. This tells me that a lot of planning has already taken place and that if we see the AFE (Authorization for Expenditures) in early new year then we are locked and loaded for a fantastic 2022. Remembering Alcoa have already asigned the funds for the build of the 1000 and 8500 plants.

    The Project Schedule details an estimated timetable for Planning, Design, Engineering, and Construction of the project and includes at least five key project dates, two of which are Kick-Off and Completion. The other three significant dates that inform vendors, contractors, and service providers of opportunities are the Authorization for Expenditures (AFE) date, the equipment Request for Quotations (RFQ's) date, and the Bid Documents (Bid Doc's) release date. All projects must have a minimum 6-month lead-time requirement for RFQ's & Bid Doc's to qualify as a valid PEC Report®, ensuring that clients have sufficient time to submit quotations or bids.

    Authorization for Expenditures (AFE): Once the capital funds for a project authorized the Owner will soon begin procurement of specified long-lead equipment and award the appropriate Engineer services necessary for the project. This is where a vendor or service provider should ask if they are on the approved vendor list and get specified.

    Request for Quotations (RFQ): IIR identifies when the project or plant owner will begin requesting proposals for equipment, materials, or services to establish pricing and delivery for the planned project or plant.

    Subcontractor Bid Documents (Bid Doc's): The PEC Report® indicates when subcontractor contracts or agreements are solicited or awarded

    Kick-Off: The Kick-Off date provides the best estimate of when construction will begin at the plant site. Depending of the type of project, the first construction phase of the project could be civil/site, mechanical, electrical or environmental.Completion: This date is when all phases of construction are complete and the project or plant is ready for final inspection, validation, commissioning and start-up

    Project Schedule Acronyms & AbbreviationsSchedule Terms:
    AFE - Authorization for Expenditure
    RFQ - Request for Quotation
    RFP - Request for Proposal
    Bid Doc - Bid Documents
    Kick-Off - Construction
    Kick-OffCompletion - Project Completion
    Start-Up - Unit or Plant Online Date

    Contract Terms:
    A&E - Architectural and Engineering
    D+E - Design and Engineering
    E+P - Engineering and Procurement
    E+C - Engineering, Procurement and Construction
    E+P+C - Engineering
    D+E+P+C/M - Design, Eng, Procurement & Construction
    Turn-Key - Complete Project Responsibilities
    Lump-Sum - Hard Money Contract
    Cost Plus - Project Cost with Fixed Fee
    P/M - Procurement Manager
    C/M - Construction Manager
    G/C - General Contractor
    E&I - Electrical and Instrumentation
    I&C - Instrumentation and Control
    Mech - Mechanical
    Sub - Subcontractor

    Activity:
    BOP - Balance-of-Plant
    EXP - Expansion
    G-R - Grassroot
    Add - Addition
    Mod - Modernization
    Mod's - Modifications
    Upg - Upgrade
    Maint - Maintenance
    S/D - Shutdown
    T/A - Turnaround
    MRO - Maintenance, Repair and OverhaulInspect - Inspection
 
watchlist Created with Sketch. Add CCM (ASX) to my watchlist
(20min delay)
Last
6.3¢
Change
0.001(1.61%)
Mkt cap ! $23.36M
Open High Low Value Volume
6.2¢ 6.4¢ 6.2¢ $17.50K 274.8K

Buyers (Bids)

No. Vol. Price($)
1 1014 6.3¢
 

Sellers (Offers)

Price($) Vol. No.
6.4¢ 151303 2
View Market Depth
Last trade - 15.31pm 19/07/2024 (20 minute delay) ?
CCM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.