EXR 0.00% 14.0¢ elixir energy limited

2021 prediction thread, page-6

  1. 7,900 Posts.
    lightbulb Created with Sketch. 1530
    Sandman first off I’d guess a 40-80 MW stage of a 250-350MW nomgon power plant plugging directly into high voltage power infrastructure already running through the PSC. Construction could commence early 2022 and online by early 2023
    Last edited by justinmetals: 27/12/20
 
watchlist Created with Sketch. Add EXR (ASX) to my watchlist
(20min delay)
Last
14.0¢
Change
0.000(0.00%)
Mkt cap ! $167.5M
Open High Low Value Volume
14.0¢ 14.5¢ 13.5¢ $188.1K 1.341M

Buyers (Bids)

No. Vol. Price($)
1 98789 14.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.5¢ 382645 4
View Market Depth
Last trade - 16.10pm 06/09/2024 (20 minute delay) ?
EXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.