But mill ground through 2.01 million tonnes in Q1 & Q2, not 1.89 or am I missing something? If the machine has a 3.0Mtpa capacity then that leaves less than a third of that capacity remaining for half the year. Or is it that the stated 3.0Mtpa capacity shouldn't be taken literally? Also Q2 report states lower ore grade than Q1.
What am I missing?
I do not mind being embarrassed in order to understand.
- Forums
- ASX - By Stock
- 2021 Production
But mill ground through 2.01 million tonnes in Q1 & Q2, not 1.89...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DCN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online