EMH 0.00% 24.5¢ european metals holdings limited

Easiest solution - just call or message EMH/Geomet and ask them....

  1. 76 Posts.
    lightbulb Created with Sketch. 31
    Easiest solution - just call or message EMH/Geomet and ask them. You can also compare the German side of the resource across the border:

    The forecast operating schedule for the mine in Zinnwald and the mineral processing unit inFreiberg is 24 hours from Monday to Friday and 6,000 hours per annum. The weekends will beused for maintenance. The chemical plant will run 24/7 and 8,000 h/a. The designed plant availabilities are typical 83 % for mine, mineral processing unit and pyrometallurgical plant

    (https://wp-zinnwald-lithium-2020.s3.eu-west-2.amazonaws.com/media/2020/10/02113210/NI43-101-Zinnwald_Feasibility-Study_Summary.pdf)

    I'm Czech and as far as I know, mines (coal mines) in the Czech Republic operate in four 6-hour shifts (6+2 hours) which overlap with maintenance - morning maintenance shift (6am), mining shift (noon), mining shift 2 (6pm), mining shift 3 (midnight). If I were preparing a PFS/production estimate, this is what I would take for granted.

    I already wrote here repeatedly that it is technically impossible to simply triple or quadruple production just because of some random fact - like upgrading the resource or adding magic hours. There are limitations especially in space because it would be a deep mine.
 
watchlist Created with Sketch. Add EMH (ASX) to my watchlist
(20min delay)
Last
24.5¢
Change
0.000(0.00%)
Mkt cap ! $50.82M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 37 24.5¢
 

Sellers (Offers)

Price($) Vol. No.
25.5¢ 15796 1
View Market Depth
Last trade - 10.02am 30/07/2024 (20 minute delay) ?
EMH (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.