"Assays results were returned to a depth of 475m with the final 76.16m for GRDD036 to be dispatched to the lab for assay with the samples for the second diamond hole in the program (GRDD037) which is currently beingc ompleted."
So it depends how long it takes them to produce results for GRDD037. The remaining 76.16m results for GRDD036 will accompany the results from GRDD037.
Given results for the first 400m of GRDD036 were delivered within a space of 2 months from drilling announcment date is it inconcievable to suggest that the remaining GRDD036 along with the entirety of GRDD037 results to arrive in April or soon there arfter?
- Forums
- ASX - By Stock
- ANL
- 2022 Discussion
2022 Discussion, page-155
-
-
- There are more pages in this discussion • 125 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ANL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.69M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
NEWS
Gold nuggets unearthed at Comet Well ahead of drilling! Discoveries continue as exploration ramps up
LU7
The Breakdown: Lithium Universe talks refinery design and lithium processing in strong preliminary feasibility study for Bécancour
ANL (ASX) Chart |
Day chart unavailable
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
SPONSORED BY The Market Online