MMI 2.17% 4.7¢ metro mining limited

2022 production progress, page-361

  1. 571 Posts.
    lightbulb Created with Sketch. 141
    It took 28 ‘big’ barges and one smaller one to load the Bei Ji Star over 14 days- take out the two days for rough weather and that gives about 15000 t per day. Looks like they have it dialed in at last. Hopefully the last ship will be loaded by Xmas eve
    looking forward to next year already!
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
4.7¢
Change
0.001(2.17%)
Mkt cap ! $279.1M
Open High Low Value Volume
4.7¢ 4.8¢ 4.6¢ $522.7K 11.18M

Buyers (Bids)

No. Vol. Price($)
5 3640922 4.6¢
 

Sellers (Offers)

Price($) Vol. No.
4.8¢ 2972414 9
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.