I've assumed the Berge Namuli left on the 5th as planned (still not updated on Q-Ships). Loading and scheduling continues to work well. If the weather holds and a 31 December season end, then there should be 3 more Capesize to come (circa 540,000t) and another 3 more Self Loaders (circa 180,000t). That would put 2023 production at approx 4,800,000t - a great result and top end of guidance. If the weather is kind, they may be able to operate into January and push it to 5,000,000t
- Forums
- ASX - By Stock
- MMI
- 2023 Production Progress
2023 Production Progress, page-231
-
- There are more pages in this discussion • 64 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMI (ASX) to my watchlist
|
|||||
Last
4.6¢ |
Change
-0.001(2.13%) |
Mkt cap ! $273.2M |
Open | High | Low | Value | Volume |
4.6¢ | 4.9¢ | 4.4¢ | $1.510M | 33.16M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 279983 | 4.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.7¢ | 899768 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 279983 | 0.046 |
3 | 1424498 | 0.045 |
6 | 2145772 | 0.044 |
7 | 1483390 | 0.043 |
4 | 440000 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.047 | 899768 | 2 |
0.048 | 1260909 | 5 |
0.049 | 2737500 | 5 |
0.050 | 7360226 | 7 |
0.051 | 1088422 | 5 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |