I've assumed the Berge Namuli left on the 5th as planned (still not updated on Q-Ships). Loading and scheduling continues to work well. If the weather holds and a 31 December season end, then there should be 3 more Capesize to come (circa 540,000t) and another 3 more Self Loaders (circa 180,000t). That would put 2023 production at approx 4,800,000t - a great result and top end of guidance. If the weather is kind, they may be able to operate into January and push it to 5,000,000t
- Forums
- ASX - By Stock
- 2023 Production Progress
I've assumed the Berge Namuli left on the 5th as planned (still...
-
- There are more pages in this discussion • 64 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMI (ASX) to my watchlist
|
|||||
Last
4.8¢ |
Change
0.001(2.13%) |
Mkt cap ! $285.1M |
Open | High | Low | Value | Volume |
4.8¢ | 4.9¢ | 4.7¢ | $416.9K | 8.702M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 633242 | 4.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.9¢ | 1065879 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 633242 | 0.048 |
7 | 649518 | 0.047 |
6 | 738427 | 0.046 |
8 | 1561538 | 0.045 |
9 | 2006098 | 0.044 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 1065879 | 10 |
0.050 | 634703 | 8 |
0.051 | 830176 | 6 |
0.052 | 1230356 | 7 |
0.053 | 1678858 | 5 |
Last trade - 13.48pm 30/07/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online