MMI 2.70% 3.8¢ metro mining limited

2023 Production Progress, page-24

  1. 661 Posts.
    lightbulb Created with Sketch. 173
    https://hotcopper.com.au/data/attachments/5213/5213097-85af8a9a462ef5499f36c1dbe281ac0e.jpg
    First ship complete - 14 days to load which is outside their target of 11 days, but pretty good none the less for the start of the season. Berge Stanley targeting an 11 day turnaround.
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
0.001(2.70%)
Mkt cap ! $225.7M
Open High Low Value Volume
3.9¢ 3.9¢ 3.8¢ $404.1K 10.53M

Buyers (Bids)

No. Vol. Price($)
14 5091829 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
3.8¢ 362115 2
View Market Depth
Last trade - 16.10pm 09/08/2024 (20 minute delay) ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.