MMI 4.26% 4.9¢ metro mining limited

First ship complete - 14 days to load which is outside their...

  1. 711 Posts.
    lightbulb Created with Sketch. 190
    https://hotcopper.com.au/data/attachments/5213/5213097-85af8a9a462ef5499f36c1dbe281ac0e.jpg
    First ship complete - 14 days to load which is outside their target of 11 days, but pretty good none the less for the start of the season. Berge Stanley targeting an 11 day turnaround.
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.