I've assumed the Berge Namuli left on the 5th as planned (still not updated on Q-Ships). Loading and scheduling continues to work well. If the weather holds and a 31 December season end, then there should be 3 more Capesize to come (circa 540,000t) and another 3 more Self Loaders (circa 180,000t). That would put 2023 production at approx 4,800,000t - a great result and top end of guidance. If the weather is kind, they may be able to operate into January and push it to 5,000,000t
- Forums
- ASX - By Stock
- 2023 Production Progress
I've assumed the Berge Namuli left on the 5th as planned (still...
- There are more pages in this discussion • 64 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMI (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $244.3M |
Open | High | Low | Value | Volume |
4.2¢ | 4.2¢ | 4.1¢ | $47.31K | 1.129M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
17 | 15065270 | 4.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 1412909 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
17 | 15065270 | 0.041 |
25 | 8020800 | 0.040 |
15 | 2508311 | 0.039 |
5 | 2329475 | 0.038 |
2 | 278422 | 0.037 |
Price($) | Vol. | No. |
---|---|---|
0.042 | 1412909 | 4 |
0.043 | 2728035 | 6 |
0.044 | 2166381 | 7 |
0.045 | 1497220 | 5 |
0.046 | 1316776 | 5 |
Last trade - 16.10pm 24/05/2024 (20 minute delay) ? |
|
|||||
Last
4.1¢ |
  |
Change
0.000 ( 2.38 %) |
|||
Open | High | Low | Volume | ||
4.2¢ | 4.2¢ | 4.1¢ | 1143388 | ||
Last updated 15.41pm 24/05/2024 ? |
Featured News
MMI (ASX) Chart |