The original drill was estimated to take about 10 days to reach the top of the target -depending on ground conditions.
We are now more than 14 days from when corrective action was to happen with depth @ 580m.
The Mac Creek drilling had form - drilled a few holes and then moved to another area that had not been planned - all without telling us until after drilling completed. Why should we expect any different news flow this time.
As for completing drilling by end of year for the $100k refund - that flows into another $100k towards assays - I certainly hope ICG make the timeline requirement of completing drilling by Dec 31
I shudder to think of what the cost will be if the drilling crew need to be still @ Alpaca over Xmas
- Forums
- ASX - By Stock
- 2023 - the year for ICG
The original drill was estimated to take about 10 days to reach...
-
-
- There are more pages in this discussion • 137 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ICG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(9.09%) |
Mkt cap ! $4.078M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.5¢ | $1.643K | 327.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 2071494 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 2455709 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 2071494 | 0.005 |
9 | 3804194 | 0.004 |
13 | 19206780 | 0.003 |
4 | 4399980 | 0.002 |
3 | 6199950 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.006 | 2455709 | 6 |
0.007 | 2447760 | 6 |
0.008 | 1450000 | 3 |
0.009 | 2033282 | 4 |
0.011 | 350000 | 1 |
Last trade - 16.10pm 06/11/2024 (20 minute delay) ? |
Featured News
ICG (ASX) Chart |