MMI 4.26% 4.9¢ metro mining limited

2024 Production Progress, page-202

  1. 733 Posts.
    lightbulb Created with Sketch. 200
    https://hotcopper.com.au/data/attachments/6200/6200267-21ab876488c16235e8aa2cf956374567.jpg
    Bulk Norway will be 11 days if it exits today (as planned). Berge Broad Peak back for another fill. If the loading rates stay as they are then we are looking at about 1.4m for the June quarter (with another boat half filled) which would be ok but nothing to shout about. Looking forward to seeing the loading rates come down as the Ikamba settles in.
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
4.9¢
Change
0.002(4.26%)
Mkt cap ! $291.8M
Open High Low Value Volume
4.7¢ 4.9¢ 4.7¢ $522.8K 10.81M

Buyers (Bids)

No. Vol. Price($)
5 697720 4.7¢
 

Sellers (Offers)

Price($) Vol. No.
4.9¢ 137983 1
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.