Bulk Norway will be 11 days if it exits today (as planned). Berge Broad Peak back for another fill. If the loading rates stay as they are then we are looking at about 1.4m for the June quarter (with another boat half filled) which would be ok but nothing to shout about. Looking forward to seeing the loading rates come down as the Ikamba settles in.
- Forums
- ASX - By Stock
- 2024 Production Progress
Bulk Norway will be 11 days if it exits today (as planned)....
-
- There are more pages in this discussion • 97 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMI (ASX) to my watchlist
|
|||||
Last
4.7¢ |
Change
0.001(2.17%) |
Mkt cap ! $279.1M |
Open | High | Low | Value | Volume |
4.7¢ | 4.8¢ | 4.6¢ | $522.7K | 11.18M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 3640922 | 4.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.8¢ | 2972414 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 3640922 | 0.046 |
4 | 888204 | 0.045 |
6 | 1727999 | 0.044 |
9 | 1842209 | 0.043 |
15 | 2795022 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.048 | 2972414 | 9 |
0.049 | 1438000 | 8 |
0.050 | 4442300 | 15 |
0.051 | 2466227 | 7 |
0.052 | 2023695 | 7 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online