Bulk Norway is still loading, although it may depart later today. "Turnarround time" was significantly longer than 8 days, but the definition of such a time is unclear. There is an initial waiting period, then a period of a single loader, then two loaders, then back to one loader as it moves to the offshore anchorage. What really matters is the average departure rate, which given a 12 day rolling average loading rates (from barge movements) of around 21kT/day, one vessel per 8.7 days. Loading rates over the last few days have shown signs or increasing such that I we use a 7 day rolling average, then it works out at 1 vessel per 8.1 days.
- Forums
- ASX - By Stock
- MMI
- 2024 Production Progress
2024 Production Progress, page-203
-
- There are more pages in this discussion • 165 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMI (ASX) to my watchlist
|
|||||
Last
5.8¢ |
Change
0.006(11.5%) |
Mkt cap ! $344.5M |
Open | High | Low | Value | Volume |
5.4¢ | 5.8¢ | 5.2¢ | $877.3K | 16.08M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 211353 | 5.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.8¢ | 952044 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 211353 | 0.057 |
1 | 150000 | 0.056 |
5 | 1048532 | 0.055 |
2 | 1135632 | 0.054 |
5 | 537499 | 0.053 |
Price($) | Vol. | No. |
---|---|---|
0.058 | 952044 | 7 |
0.059 | 3199605 | 10 |
0.060 | 1897984 | 15 |
0.062 | 48633 | 1 |
0.063 | 100000 | 1 |
Last trade - 16.10pm 09/07/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |