MMI 6.25% 4.5¢ metro mining limited

2024 Production Progress, page-26

  1. 1,780 Posts.
    lightbulb Created with Sketch. 480
    should be FC to start with but mid-April the CROC kicks into gear.

    will be interesting to see how quickly the capes are loaded once you've got the FC and CROC ganging up on a poor cape together from both sides.

    > 10 days need to become ~5 days to get optimal loading into them capes. Then its game on.
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
4.5¢
Change
-0.003(6.25%)
Mkt cap ! $267.2M
Open High Low Value Volume
4.8¢ 4.8¢ 4.5¢ $117.3K 2.536M

Buyers (Bids)

No. Vol. Price($)
3 679618 4.5¢
 

Sellers (Offers)

Price($) Vol. No.
4.7¢ 479738 4
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.