TinnyVale, you mention that we are 5 boats down at this point. I have a model targetting 7MT for the FY. It has a production building until Aug, and a reduction in Dec. Relative to that profile, I estimate that we were short about 80kT in May due to the wobbler late commissioning and short 180kT in June due to what looks like equipment failure at the start of the month. So, about 260kT, which is I suppose 1.5 in boat terms short to date.
To have a good out turn for the year, I agree that they do need some fortune and they haven't had that over their operation lifetime. Interestingly poised and needs very careful management attention.
- Forums
- ASX - By Stock
- MMI
- 2024 Production Progress
2024 Production Progress, page-324
Featured News
Add MMI (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.1¢ |
Change
0.001(2.00%) |
Mkt cap ! $303.7M |
Open | High | Low | Value | Volume |
5.1¢ | 5.2¢ | 4.9¢ | $868.6K | 17.23M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1563632 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.1¢ | 839015 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 463632 | 0.050 |
3 | 488212 | 0.049 |
4 | 2269049 | 0.048 |
4 | 823361 | 0.047 |
3 | 2002500 | 0.046 |
Price($) | Vol. | No. |
---|---|---|
0.051 | 30000 | 1 |
0.052 | 2135331 | 7 |
0.053 | 1145759 | 4 |
0.054 | 2129425 | 8 |
0.055 | 1105072 | 10 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online