because there's overlap when two capes are being loaded at the same time
the better metric is to look at the days between current departure date and departure date two ships ago and divide by two
if berge leaves on the 4th that's realistically 6.5 days average to load the last two capes
- Forums
- ASX - By Stock
- 2024 Production Progress
because there's overlap when two capes are being loaded at the...
-
-
- There are more pages in this discussion • 143 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMI (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.9¢ |
Change
-0.001(2.50%) |
Mkt cap ! $231.6M |
Open | High | Low | Value | Volume |
4.0¢ | 4.2¢ | 3.9¢ | $283.3K | 7.050M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1434667 | 3.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.0¢ | 300000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 1384667 | 0.039 |
8 | 3176868 | 0.038 |
8 | 2447470 | 0.037 |
4 | 358252 | 0.036 |
9 | 3241006 | 0.035 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 300000 | 1 |
0.041 | 1029329 | 4 |
0.042 | 250000 | 1 |
0.043 | 1013095 | 2 |
0.044 | 2430950 | 5 |
Last trade - 16.10pm 23/08/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |
The Watchlist
SER
STRATEGIC ENERGY RESOURCES LIMITED
David DeTata, Managing Director
David DeTata
Managing Director
SPONSORED BY The Market Online