MMI 2.50% 3.9¢ metro mining limited

because there's overlap when two capes are being loaded at the...

  1. 233 Posts.
    lightbulb Created with Sketch. 42
    because there's overlap when two capes are being loaded at the same time

    the better metric is to look at the days between current departure date and departure date two ships ago and divide by two

    if berge leaves on the 4th that's realistically 6.5 days average to load the last two capes
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
-0.001(2.50%)
Mkt cap ! $231.6M
Open High Low Value Volume
4.0¢ 4.2¢ 3.9¢ $283.3K 7.050M

Buyers (Bids)

No. Vol. Price($)
7 1434667 3.9¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 300000 1
View Market Depth
Last trade - 16.10pm 23/08/2024 (20 minute delay) ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.