MMI 0.94% 5.3¢ metro mining limited

2024 Production Progress, page-352

  1. 6 Posts.
    I think the barge loading issue may have been due to weather- see the chart below. Last 3 days, significant wave height at offshore anchorage has been above 1m for most of the time- this would at least slow down all barge maneuvers for safety issues. Maybe thats why Ikamba was towed offshore not TSA Skardon, as based on historical operations it would have barely loaded anything in these conditions? Ikamba finished loading BB and it got away in these 3 days.

    https://hotcopper.com.au/data/attachments/6295/6295530-e1cb89763b3a78ed0091e4eac2e41982.jpg

 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
5.3¢
Change
-0.001(0.94%)
Mkt cap ! $308.8M
Open High Low Value Volume
5.3¢ 5.3¢ 5.2¢ $113.1K 2.148M

Buyers (Bids)

No. Vol. Price($)
15 1698973 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 988556 9
View Market Depth
Last trade - 12.49pm 08/07/2024 (20 minute delay) ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.