MMI 2.13% 4.6¢ metro mining limited

2024 Production Progress, page-358

  1. 10,659 Posts.
    lightbulb Created with Sketch. 230
    I've got 31 barge movements since and including 5July, when@Arrow666 indicates CV started loading, through 7July. Say that's 15 outward loaded trips at 6,000t/barge.

    15*6000 = 90kT

    But split over BB and CV, I presume, with BB not departing until the 7th - yesterday.

    Today they have 7 barge movements completed or planned up until 16:30pm today. Assume they'll complete 4 outward laden barge movements today, that's another 24kT minimum loaded (allowing they may do more than that after 16:30), onto CV alone - with BB having departed yesterday.

    I'm posting this for anyone to correct or confirm what I'm doing here, rather than any great desire to sweat the day by day.
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.