I've got 31 barge movements since and including 5July, when@Arrow666 indicates CV started loading, through 7July. Say that's 15 outward loaded trips at 6,000t/barge.
15*6000 = 90kT
But split over BB and CV, I presume, with BB not departing until the 7th - yesterday.
Today they have 7 barge movements completed or planned up until 16:30pm today. Assume they'll complete 4 outward laden barge movements today, that's another 24kT minimum loaded (allowing they may do more than that after 16:30), onto CV alone - with BB having departed yesterday.
I'm posting this for anyone to correct or confirm what I'm doing here, rather than any great desire to sweat the day by day.
- Forums
- ASX - By Stock
- 2024 Production Progress
I've got 31 barge movements since and including 5July,...
-
- There are more pages in this discussion • 59 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
Add MMI (ASX) to my watchlist
|
|||||
Last
4.6¢ |
Change
-0.001(2.13%) |
Mkt cap ! $273.2M |
Open | High | Low | Value | Volume |
4.7¢ | 4.8¢ | 4.6¢ | $136.8K | 2.928M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 763395 | 4.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.6¢ | 36688 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 763395 | 0.045 |
11 | 1774325 | 0.044 |
10 | 1298903 | 0.043 |
7 | 595580 | 0.042 |
3 | 650000 | 0.041 |
Price($) | Vol. | No. |
---|---|---|
0.046 | 36688 | 1 |
0.047 | 124064 | 5 |
0.048 | 272358 | 4 |
0.049 | 903539 | 6 |
0.050 | 1841623 | 5 |
Last trade - 11.23am 02/08/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |