MMI 1.89% 5.2¢ metro mining limited

from 29/6 to 16/7 (i saw it leave just before midnight) means 17...

  1. 233 Posts.
    lightbulb Created with Sketch. 42
    from 29/6 to 16/7 (i saw it leave just before midnight) means 17 days to load a cape and a newcastle

    8.5 days average per ship

    considering the larger ship and the bad waves we've had for 2 switchovers

    it's pretty positive
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
5.2¢
Change
-0.001(1.89%)
Mkt cap ! $309.6M
Open High Low Value Volume
5.3¢ 5.3¢ 5.2¢ $1.300M 24.86M

Buyers (Bids)

No. Vol. Price($)
4 854720 5.1¢
 

Sellers (Offers)

Price($) Vol. No.
5.3¢ 1693409 5
View Market Depth
Last trade - 16.10pm 01/11/2024 (20 minute delay) ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.