MMI 0.00% 5.0¢ metro mining limited

2024 Production Progress, page-391

  1. 10,645 Posts.
    lightbulb Created with Sketch. 227
    Not a week that tells us much about their further optimising loading rates. But:
    - this happens
    - it's expected and allowed for in production forecasts
    - with them recommencing loading on the 19th and increasing on the 20th and 21st we have some sort of indication that loading may be affected above about 1m significant wave height (though I imagine direction may be important also)

    It will be interesting to see if the experience this last week has resulted in them adapting their use of the new equipment to improve on how they handled this time and whether the extra sea tug will improve things when it arrives

    https://hotcopper.com.au/data/attachments/6327/6327109-d280a35932c57e02e7f55c43e1f7cbc0.jpg

    https://hotcopper.com.au/data/attachments/6327/6327112-d05107921935e71af3bde6bc5f05be8d.jpg

 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.000(0.00%)
Mkt cap ! $296.9M
Open High Low Value Volume
5.0¢ 5.0¢ 5.0¢ $109.9K 2.199M

Buyers (Bids)

No. Vol. Price($)
10 738573 4.9¢
 

Sellers (Offers)

Price($) Vol. No.
5.0¢ 16440 2
View Market Depth
Last trade - 10.12am 22/07/2024 (20 minute delay) ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.