As I noted up the thread, I am counting barge trips both ways. Loaded and returning empty. 9 trips can be five out loaded and four back empty, or the other way around. But it averages out, when divided by two, to the number of completed barge loadings at the bulk loading facility, trips to the sea ship anchorages, unloadings and returns.
I hope that clarifies/helps.
- Forums
- ASX - By Stock
- 2024 Production Progress
As I noted up the thread, I am counting barge trips both ways....
-
- There are more pages in this discussion • 112 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MMI (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.4¢ |
Change
-0.001(2.86%) |
Mkt cap ! $202.4M |
Open | High | Low | Value | Volume |
3.6¢ | 3.6¢ | 3.4¢ | $1.040M | 30.36M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
9 | 2535065 | 3.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 660892 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
9 | 2535065 | 0.033 |
8 | 1025793 | 0.032 |
5 | 622225 | 0.031 |
5 | 3217000 | 0.030 |
1 | 800000 | 0.028 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 660892 | 6 |
0.036 | 907848 | 2 |
0.037 | 564000 | 3 |
0.038 | 363533 | 4 |
0.039 | 1350000 | 3 |
Last trade - 16.10pm 17/09/2024 (20 minute delay) ? |
Featured News
MMI (ASX) Chart |