MMI 2.50% 3.9¢ metro mining limited

2024 Production Progress, page-483

  1. 64 Posts.
    lightbulb Created with Sketch. 6
    Very interesting @Slyxer I wonder if it is due to the increased ship loading rates.
    If the TSA skardon and Ikamba are loading at a rate quicker that we can turn the barges around to them possibly the decision was made to short load the barges to turn them around quicker and ensure the ship loaders have product to load.
    Perhaps when the next barge turns up this issue may be resolved.

    All a guess but makes sense to me.
 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
3.9¢
Change
-0.001(2.50%)
Mkt cap ! $231.6M
Open High Low Value Volume
4.0¢ 4.0¢ 3.9¢ $106.1K 2.699M

Buyers (Bids)

No. Vol. Price($)
2 808825 3.9¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 721273 10
View Market Depth
Last trade - 10.53am 27/08/2024 (20 minute delay) ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.